Growing up

Development for better tomorrow

Visitors are our priority. To please your visit, we challenge ourself to achieve better result repeatedly. We believe that by doing better, we can create better experience for you and your love ones in crafting priceless memories during your visit.
Create with the heart; build with the mind

The Penang Hill upgrades

Over the carefully planning and studies carried out. We outlines improvements around Penang Hill. These will not only restructure the image, but also building a whole new experience for the tourist's hot spot.

Phase One

Elevated Walkway
Alternative route to Astaka and Dataran Bukit Bendera
Retractable Roof
To provide convenience to tourist and visitor and enhance lover station landscape.
Phase1 1
Phase1 2
Phase1 3
Phase1 4
Phase1 5
Phase1 6

Phase Two

Sky Walk & Lift
Penang Hill icon that provide easy access to KBB Bungalow For the senior elder people and OKU to enjoy the extended deck
View Decks & Gardens
Newly constructed view decks to cover 180 degree spectacular view of Georgetown surrounding area
Holding Area
Extension of the Upper Station holding area for tourists convenience
Holding Area2
View Decks  Gardens2
Sky Walk

Phase Three

Phase Three will be implemented starting early 2017. This project is design so that it can cater the number of visitors that come to Penang Hill especially during peak season such as School Holiday.
Phase3 01
Phase3 02
Phase3 03
Phase3 04
Phase3 05jpg















Completed Projects

Over the years, Penang Hill had completed a series of improvement activies. These activities resulted as one of today's hot spot in northan Malaysia. Project scale doesn't weight much as compare to effort of our passionate employee putting in thier ideas turning plan into works.

2013 Projects

LED Lightings at Lower Station (Viaduct Walkway)

To beautify the Viaduct Walkway at lower station especially during night time
1
2

ByPath A, B, C, D

Upgrading the walking trails on Penang Hill to give more pleasure and safer environment for the visitor’s and hikers.
1
2
3
4

Toilet Upgrades at Middle Station

Upgrade the toilet facilities in Middle Station especially for hikers.
1
2
3
4

Rectractable Roof Canopy (Phase 1)

Upgraded the lower station with more sitting area (planter box) and Retractable Roof.
1
2
3

Lightings along the track

Installation of Light poles and Sport Light along the track.
1
2
3

Landscape along the Summit Road at Upper Station

Beautify the Summit Road with various plants and trees. Giving pleasure to the visitors who walk along the road.
1
2

2014 Projects

LED Signage

Install LED Signage at the Air Itam Roundabout
1
2

Upgrade Septic Tank

Upgrade the CST B (Sewerage System at Upper Station)
1
2

Covered Walkway

Upgrade the walkway with covered roof from Lower Station to On-Grid Park
1
2

Viewing Deck and Skywalk at Upper Station (Phase 2)

Build viewing deck and skywalk at upper station for visitors to enjoy the beautiful scene from Penang Hill
View Decks  Gardens2
Sky Walk

Heritage Walkway from Lower Station to Middle Station

Upgrade the heritage walkway and create a more comfortable path for the residents, workers and hikers.
1
2
3

Upgrading landscape along walkway next to upper station clinic

Beautify the walkway next to clinic with more plants that suits the hill.
1
2
3

2015 Projects

Holding Area

For the convenience of the train users, the holding area space was upgraded. So, the visitors do not have to worry about hot weather anymore.
Holdingarea01
Holdingarea02
Holdingarea03
Holdingarea04

New Office at top of Multistory Car Park

The new office was located on the highest level of the PBBPP building. It can occupy around 50 staffs at a time.
Phase4 1
Office01a
Office02a
Office03a
Phase4 2
Phase4 3
Phase4 4

2016 Projects

Refurbish Hillside Bungalow

Upgraded one of the heritage bungalow on Penang Hill
B1
B2
B3
B4

Refurbish PHC Guest House and Tulip House

These two houses were refurbished so that the staff of Penang Hill can enjoy the scenery and view of Penang Hill by staying up there.
Guesthouse01a
Guesthouse03a
Guesthouse04a
Guesthouse05a
Tuliphouse01a
Tuliphouse02a
Tuliphouse03a

New Roof at Lower Station Turnstile

The new post-ticketing system that has been implemented in Penang Hill Station requires covered roof so that it will provide comfort to the users when exiting the train.
Roofturnstile01
Roofturnstile02

ByPath E,F,G,H,I,J

Upgrading the walking trails on Penang Hill to give more pleasure and safer environment for the visitor’s and hikers.
BypathE1
BypathF
BypathG
BypathH
BypathI1
Bypathj1

The Little Village (Supported Project)

The surround area of The Little Village was design to replicate the dwarf’s houses. The main attraction here is the bees and visitors can also purchase the honey that is sold here.
Beegallery03a
Beegallery01a
Beegallery02a
Beegallery04a

Earthquake And Typhoon Pavilion (Supported Project)

This place is design to replicate the environment of typhoon and earthquake and also to memorize the tsunami that erupted certain places in Malaysia.
Typhoon01a
Typhoon02a
Typhoon03a

2017 Projects

Toilet Upgrades

The new toilet upgrades is at Jalan Tuanku Yahya Petra, Penang Hill.

Project Start Date - 7 August 2017
Project End Date - 2 October 2017
Toilet1
Toilet2
Toilet3
Toilet4
Toilet5

Road Upgrades

Road upgrades along the way at Jalan Upper Tunnel

Project Start Date - 4 April 2017
Project End Date - 21 August 2017
U1
U2
U3
U4
U5

Ongoing Projects

Station Maintenance

Station Involved: Station Upper Tunnel, Station Lower Tunnel, Station Claremont

Project Start Date : 13 October 2017
Estimated Project End Date: 8 December 2017
M1
M2
M3
M4

Gazebo Reparation

Location: Jalan Tuanku Yahya Petra, Bukit Bendera

Project Start Date : 13 October 2017
Estimated Project End Date: 3 November 2017
P1
P2
P3
P4

Phase 3's progress

Location: Lower Station

Project Start Date :29 December 2016
Estimated Project End Date: 28 August 2018
P1
P2
P3
P4